yes the sewage-pipe served by a basement wall about one-third were wanted, that can actually do the Keller farm last week, but has not happened. Thus, the Wednesday advised and indeed today, the tube was exposed and placed a piece slightly offset, so that now the interior construction of the terminal can take place.
As for the forgotten slot, so this has now been made, but only half. Not only do we have arranged the pipe for the relocation of the electrical connections of the backwater valve to the wall about 80cm offset, although this should be run directly from the soil into the slot at the ceiling. No, you now have the slot on the switch, made-to-ceiling rather than floor to ceiling.
I really wonder why there are plans, except to ignore ;-)
has And if you bet that the flowable Cover the return valve is also provided: