... Hurrah then house-position day :-)
Now that the last months of the project is so Leutenbach hingedümpelt right to appear in the final weeks and days of events to overtake each other want.
As there would be:
- the pending program change after Effizienzhaus55 EnEV2007 in EnEV2009 at KfW
- the pending and now rejected ex post financing, thanks to super-great writer-performance plan :-(
- again (for the passes as times actually!?) a "small" inconsistency in the plans, how could it be otherwise, already the architect, determined not under the slogan "It's a bug, it's a feature, created
was now what it has with the KfW program change about?
few months ago I had read that under certain conditions Possibility of getting the new conditions for the effectiveness houses 55 and 40, ie 5,000 or 10,000 EUR eradication grant.
goes specifically, thus ensuring that our house planning from the start has targeted a low-energy house, that is, additional insulation, no roof windows, the most efficient window use, photovoltaic + solar thermal, heat bridges moöglichst little, if possible LED light etc. And so we were experts from compliance with the limits for a Effizienzhaushaus55 also confirmed after EnEV2009.
goes specifically, thus ensuring that our house planning from the start has targeted a low-energy house, that is, additional insulation, no roof windows, the most efficient window use, photovoltaic + solar thermal, heat bridges moöglichst little, if possible LED light etc. And so we were experts from compliance with the limits for a Effizienzhaushaus55 also confirmed after EnEV2009.
In June, I called therefore to KfW to me about the Possibility of alteration of Effizienz70 Effizienz55 on to find out from already promised funding. After reviewing our application for a change has been communicated to me as possible, since we had started the construction yet, or indeed have no alternative, have obtained 50%. That was in our case because of the delays are not too heavy. The necessary documentation of the construction is already made in the planning phase involved energy consultants and we are still waiting for an authoritative answer KfW ...
On the subject of the bursting Nachfinazierung is actually far nothing else to say except: poor performance of Love Bank, as the infected Added value in the house, but that seems to the non-penetrated (s) in charge ... This now means that the building trades, drywall and interior doors must also be implemented on site. How fortunate that I had yesterday already purchased a grinding giraffe that has now really to exist. Otherwise, we will, I think, slowly looking for a good customer or MyHammer Blauarbeit.de ;-) time as the time in the next 3 months all fits ...
Finally came a call today at 17:30 at Hameln, that prior to the immediate completion of the north wall is a lack of alignment of the two windows of EC + DG has been identified that originate in has the original plans. Thank you dear architect for a thorough job, and this great "Easter egg", but now we are more than enough ...
Well, the evening shift's to be addressed and so it goes tomorrow, actually tonight altered wall with the remaining parts on the way people stream to the House deadline on Thursday is not compromised, while the vanguard of tomorrow in the afternoon final preparations will come to the base. What a coincidence that now looks well past tomorrow is also the Keller farm to mill the lack of electric slot, the waste water pipe under the basement walls and expose the flowable cover by bringing the backwater valve.