Vom 02.08.bis 04.08. war's dann auch so weit, die Holde wurde zur Dokumentation des Aufbaus verdonnert und mit Kamera ausgestattet vor Ort bei den Nachbarn zum Kaffee-Kränzchen ausgesetzt
Den Aufbau gibt's in Form some combine images, it can be as follows:
- largely trouble-free installation of the basement walls
- high entertainment value when attempting the stairs to the basement ceiling to install
- was less funny, the fact that it is not for the connection of the drainage has seen responsible:
"We had never done, but on our behalf, there was nothing of drainage connection"
Instead, they set in concrete in the foundations so generously distributed the concrete that is the question , if someone the drainage pipe was also in concrete, but for him the concrete :-(
- ran out Ah yes, the patio foundations should support actually a terrace at the level of the ground floor, too bad only that the ground level not is as low as the foundation. We are talking only of 50-80 cm so obviously, I think I will have to re-measuring the time ...
0 comments: